CF Industries

Location: Donaldsonville, LA – Mississippi River

Project Description:

Lanier & Associates Consulting Engineers, Inc. provided permitting, engineering design and construction management for the new barge loading dock and approximately 2400 lf of conveyor for the CF Industries Donaldsonville Nitrogen Complex. The dock includes a fixed shuttling loader, barge haul system and a process water intake system. The dock is used to load barges of bulk urea. The engineering design was completed in 2013 and construction was completed in 2013. The project was part of the $2.1 billion expansion of this terminal.

Project Gallery

CF Industries

Location: Donaldsonville, LA – Mississippi River