Port of Gulfport

Location: Gulfport, MS

Project Description:

Lanier & Associates provided project management, surveying, and construction management services for the Port Gate Facility and the Chiquita M&R Building. Lanier also managed the design process and provided oversight for the architectural, structural, and MEP design performed by our local sub-consultants. The Chiquita M&R Building included an elevated office building for terminal staff and a steel frame building to maintain and repair terminal equipment. All mechanical, electrical, and utilities located in the shop were custom designed for resiliency to storm surge impacts. The elevated foundations are designed to withstand the forces of waves and the grade-level metal building is designed to minimize damage during a storm event. The Port Gate Facility was designed for functionality, resiliency, and beauty, with a modern space frame canopy providing shelter to secure staff and vehicles.

Project Gallery

New Ship / Barge Dock

CF Industries

Location: Donaldsonville, LA – Mississippi River