Ship/Barge Crude Oil Dock

Location: Mississippi River

Project Description:

Lanier & Associates provided permitting, preliminary/detailed engineering and construction management for this Crude Oil unloading terminal.  Design included ship/barge dock, hose tower, liquid loading arms, levee crossing pipe bridge and mooring dolphins.  Lanier also provided mechanical and electrical engineering design for the Condensate Storage and Transshipment terminal.
Ship/Barge Crude Oil Dock

Project Gallery

New Ship / Barge Dock

CF Industries

Location: Donaldsonville, LA – Mississippi River