Ship/Barge Dock and Vapor Control

Location: Neches River

Project Description:

Lanier & Associates provided the engineering design and cost management for this project. The dock was designed for SPR and can offload crude oil at 50,000 BBL/hr and load through the VC equipment at 20,000 BBL/hr. 100,000 DWT where ships can be accommodated. This project photo features an aerial view of the ship dock and U.S. Coast Guard certified Marine Vapor Control System.
Ship/Barge Dock and Vapor Control

Project Gallery

New Ship / Barge Dock

CF Industries

Location: Donaldsonville, LA – Mississippi River